§ 18.07.020. Procedure.  


Latest version.
  • A.

    Application.

    1.

    All applications shall be initiated by the property owner or his authorized representative by paying the required fee and by filing an application on city forms no less than fifteen (15) days prior to the hearing date, along with the following:

    2.

    A plot plan which includes:

    a.

    Name, address, and telephone number of property owner.

    b.

    Scale of one inch is equal to fifty (50) feet or other approved scale.

    c.

    North point and date.

    d.

    Reference to survey lot corner, section, township, and range.

    e.

    Park boundary and approximate dimensions.

    f.

    Location and dimensions of all park improvements and all park spaces, including but not limited to:

    i.

    Sewer and water lines, pump stations and fire hydrants;

    ii.

    Electrical systems and power pole;

    iii.

    Existing and proposed buildings;

    iv.

    Garbage containment plan;

    v.

    Open spaces, play areas, storage areas, etc.

    g.

    Drainage ways and easements.

    h.

    Hazard and problem areas (high water table, steep topography, muskeg areas, etc.).

    i.

    Width and approximate grade of park access roads and their connection with other streets.

    j.

    Vicinity map.

    k.

    Proposed easements, if applicable.

    3.

    Management plan for the MHP which includes:

    a.

    Method for insuring that water, sewer, and electrical hookups conform to adopted health and safety standards;

    b.

    Landscape plan;

    c.

    Once approved by the planning commission, this agreement must be approved by the city planner and signed by the commissioner and filed with the city planner.

    B.

    Notification.

    1.

    The notice shall contain:

    a.

    Name of applicant, date, time, and place of hearing.

    b.

    Descriptive location of property and legal description, if available.

    c.

    Number of spaces, size of spaces.

    d.

    Description of nonresidential uses, if proposed.

    e.

    Location where information may be examined.

    f.

    Reference sections of ordinance which pertain.

    g.

    Explanation of appeal procedure.

    2.

    Notice of the hearing shall:

    a.

    Be made by first class mail to property owners within three hundred (300) feet of the exterior property boundary and shall be posted in three public places no less than ten (10) days prior to the hearing date.

    3.

    Notification to approve or deny:

    a.

    Notification shall be sent to the applicant and any affected party who requests notification in writing.

    b.

    Notification denying an application shall be mailed within five days of the date the decision was made and shall explain appeal procedures.

(Ord. 98-12-01 § 5 (part))