§ 17.32.040. Preliminary review.  


Latest version.
  • A.

    Concept Review. After initial consultation with the city administrator pursuant to Section 17.28.020, a review of the preliminary development concept shall be made by the platting board. This will identify many of the planning and platting complications posed by the development and will also afford the applicant with an early indication of the community's intent towards the proposal before proceeding with extensive planning and engineering studies usually necessitated by this development approach.

    B.

    Preliminary Plat Review. The preliminary plat submittal shall contain essentially the same information required in the regular platting procedure and shall also contain a written statement identifying all platting ordinance design and improvement standards which are proposed to depart from regular requirements. This formal preliminary plat review shall be made before the platting board holds the required public hearing. Along with the preliminary plat, or at the option of the subdivider's part of the preliminary plat, the subdivider shall submit the following listed in Sections 17.32.050 and 17.32.060.

    (Ord. 86-03-04-01 § 1 (part): prior code § 95.14.040)

(Ord. No. 18-03-08, § 3(Att.))